Earn & Learn · AI Infrastructure
Area I HVAC JATC Environmental Control System Servicer/Installer
Sponsored by Area I HVAC JATC · Environmental Control System Servicer/Installer
What families should know
An Oregon registered apprenticeship in environmental controls. It is an adjacent trade pathway; data-center placement is not established.
Decision facts
What we could verify
This record is organized as a registered apprenticeship. That structure does not, by itself, confirm a current opening, placement, or employer assignment.
- Service area
- The standards define an Oregon geographic area; exact job assignments depend on participating employers
- Listed location
- Portland, OR This may be a sponsor, training, or service region, not a work site.
- Delivery mode
- in person
- Who the verified information describes
- Applicants who meet the current standards and sponsor selection process; selection and dispatch are not guaranteed.
- Eligibility
-
- Minimum qualifications and selection procedures are defined in the current Oregon standards; verify them with the sponsor before applying.
- Compensation
- The state detail lists an average wage, but apprentice starting wages and current placement terms must be confirmed with the sponsor.
- Duration
- 8,000 hours
- Credential
- Oregon registered-apprenticeship completion for Environmental Control System Servicer/Installer.
Next action
What happens next
Review the current standards and use the sponsor route on Oregon BOLI to begin the application process.
Fit and tradeoffs
Questions to resolve before applying
- Data-center placement is not established.
- Accepting applications does not guarantee selection or employer dispatch.
Sources and review details
Where these details came from
Quan Pathways keeps evidence for registered apprenticeships and other structured pathways separate from current availability sources and displays the date each source was checked.
-
Supports: identity, applicant-action, availability, location. Observed Aug 25, 2026.
The sponsor route does not guarantee selection, dispatch, worksite, or data-center placement.
-
Supports: registration, adjacent-boundary, duration, eligibility. Observed Aug 25, 2026.
The standards do not establish a data-center assignment.
See something outdated? Send a correction.